Scaffolding for the construction of log cabins.
As they say slovenias: "The further into the forest - more logs." This proverb is well reworked displays the status of construction of the second floor of a log house. Here, we can not do two in a meter high scaffolding to lift the timber to the height of the floors. And inevitably we are faced with the need to erect scaffolding.
As we have already mentioned in the article about self-assembly kits for the log of our company - the first floor is growing by leaps and bounds. All the parts are there, are numbered, it is easy to fit, high lift them do not. Becomes more complicated when installing the second floor. It seems that for some time stopped building. The fact is that there comes a time to gather wood and scaffolding. Is not unimportant that these devices are important in the construction going on the perimeter of the house. This requirement is dictated by the fact that the house is going extremely consistent with beams laying around the perimeter of the house of the future. It is impossible in the brick house building drive out one wall and then attach to it another.
Briefly reservation about what forests are. Wood, metal and composite. Type of scaffolding to be installed around the log depends on the area in which you build a house. It will be funny if you imagine a modern lightweight aluminum quick-design anywhere in the Polesie district ranger in the construction of the house. Of course, there is scaffolding will be made from the newly cut fir or pine. At the same time, it is difficult to provide such construction in the center of the city, where construction is in full view of 10 regulatory agencies, and Greenpeace, to boot.
We extend the classification of scaffolding:
Wedge;
frame;
pin;
clamp.
These names depend on the method of the connection element designs. We will not go into a description of each species.
I want to dwell on the forests, which are used for the construction of the most common types of homes the company - a house with an attic. It is appropriate to recall the case when one of our customers have anxiously examined construction estimates, and found in her article - the scaffolding in the form of additional wall material. But when the building came up to the second floor - the questions he had disappeared. Excessive wall boards were used as the basis for scaffolding, but not in the form of pillars, but as a cantilever projecting from the walls and ceiling structural elements. They were laid planks on which the workers went installers, piled lumber and elements of the roof structure. After completion of construction, when the cantilever elements have been cut off at the wall level, the customer segments used for the production of a set of garden table and benches, which are so successfully combined with the design of a wooden house.
Have you tried to calculate how much extra building materials is necessary in order to usher in the forest around the log? Yes - quite a few! Therefore, for some time, such structures are simply taking on lease from specialized firms. Requirements to be nominated high scaffolding. On how much they depend on reliable security installers.
As the Board can recommend not to disassemble the timber immediately after the construction of the attic and roof finish decorative trim, install gutters and snegouloviteli - brakes. This will save on the re-erection of forests.
Of course - construction woods with their hands can do, but as a rule, it will be only the simplest designs for the individual developer. Most often in such a way to economic construction erected wooden scaffolding frame type for a single work for a small load. A self-made forest of metal - come out more expensive, so renting of scaffolds should be provided for the construction of your plan! Prefabricated wood - saving time and money.